Stream Reclamation Schem Stream

/

Stream Reclamation Schem Stream

The Schem Stream  reclamation was a part of the Highway 6 master plan. KSM was responsible for the reclamation of 2 kilometers of stream including hydrologic redesign and stabilization using plants, engineering fabrics, and rip rap lining. In addition KSM designed biking-hiking trails and pic nic areas.

 

Location
Category

Environmental and Land Planning

Status

Completed

Location

Bat Hefer, Israel

Year

2003-2004